Ballast 0-20 mm is a ready-blended mix of sharp sand and gravel with stones up to 20 mm. It is often sold as all-in ballast or 20 mm ballast, and it is the grade most builders reach for when mixing concrete by hand or in a mixer. Add cement and water and you have a general-purpose concrete for foundations, footings, shed bases and fence posts. The sand and gravel come from the depot nearest to you, so the colour varies from one part of the country to the next. That has no effect on the strength of the concrete.
Concrete is mixed by volume, so use the same bucket for cement and ballast. As a rule of thumb:
Add water a little at a time until the mix holds its shape without water pooling on the surface. Too much water makes weak concrete. For a load-bearing structure, follow the specification given by your engineer or building control rather than a rule of thumb.
One cubic metre of finished concrete takes roughly 1.8 tonnes of ballast and 14 to 15 bags of cement at 25 kg, mixed 1:5. The ballast compacts as the cement paste fills the gaps between the stones, which is why you need more loose material than the finished volume.
One bulk bag of around 800 kg with six or seven bags of cement gives close to 0.45 m³ of concrete. That is enough for a shed base of 3 m by 1.5 m at 100 mm thick, or for about 25 fence post holes. Work out the volume of what you are pouring in metres, multiply by 1.8, and round up to the next bulk bag.
The number is the largest stone in the mix. Ballast 0-10 mm is finer and suits thin sections, patching and post holes where a bigger stone would get in the way. Ballast 0-40 mm has larger stones and is used for thick mass-fill foundations where the extra bulk saves cement. Ballast 0-20 mm sits in the middle and works for almost every domestic job, so choose it unless you have a reason to go finer or coarser.
Ballast is not a drainage material. The sand content packs down and holds water, so use a clean single-sized gravel or a drainage stone for soakaways, French drains and pipe bedding. It is also not a wearing surface. Loose ballast on a driveway breaks up under tyres, and as a sub-base under block paving or tarmac it does not lock together the way a crushed MOT Type 1 does. Use ballast for what it is made for, which is concrete.
Yes. All-in aggregate, all-in ballast and ballast are different names for the same blend of sand and gravel. The grade, here 0-20 mm, tells you the size of the largest stone.
Only for light jobs such as a path or a small shed on soft ground, and only if it is compacted in layers. For anything that carries a vehicle, use MOT Type 1 and keep the ballast for the concrete on top.
Measure length and width in metres, multiply by the thickness in metres, usually 0.1, and multiply the result by 1.8 to get tonnes of ballast. A 2.4 m by 1.8 m base at 100 mm is 0.43 m³, so one bulk bag.
No. Ballast is dug locally and ranges from yellow to grey to brown. The colour shows in the finished concrete but has no bearing on its strength.
Please note that the stones are measured at the narrowest point. The sizes used on the page therefore refer to the technical measurement. Because the gravel is measured at the narrowest point, the actual size may vary slightly.
© Copyright 2026. Powered by Gravel Base Ltd
Built by Gravel Group · Aggregate Technology
Enter your postcode to see availability and prices in your area. The first part is enough – for example EC1A or M20.
We use cookies that are needed to run this website. They are always set. Other cookies help us measure how the site is used and let us show you relevant advertising. Those are only set if you agree.
Your choice is voluntary. You can use the shop either way, and you can change or withdraw your decision at any time.