| Product | Delivery | Minimum order | Price incl. delivery & VAT | Order |
|---|---|---|---|---|
| Sub Base Prices Bristol, City of | ||||
| Ballast |
|
2 Pallets | £ 267 / Pallets Order 16 Pallets: £ 266 / Pallets | Order |
| Ballast |
|
1 truckload | £ 1,037 | Order |
| Ballast |
|
1 truckload | £ 1,087 Order 20 truckload: £ 1,059 / truckload | Order |
| Ballast |
|
1 Bag | £ 108 | Order |
| Ballast |
|
1 Pallets | £ 138 | Order |
| Ballast |
|
3 ton | £ 84 / ton Order 20 ton: £ 64 / ton | Order |
| Ballast |
|
1 truckload | £ 1,200 Order 20 truckload: £ 1,028 / truckload | Order |
| Ballast |
|
1 Bag | £ 108 | Order |
| Ballast |
|
1 Bag | £ 171 | Order |
| LECA - Expanded Clay Aggregate |
|
1 Pallets | £ 320 | Order |
| LECA - Expanded Clay Aggregate |
|
1 Pallets | £ 515 | Order |
| LECA - Expanded Clay Aggregate |
|
1 Bag | £ 254 | Order |
| MOT Type 1 Sub Base |
|
2 Pallets | £ 267 / Pallets Order 16 Pallets: £ 266 / Pallets | Order |
| MOT Type 1 Sub Base |
|
1 truckload | £ 1,037 | Order |
| MOT Type 1 Sub Base |
|
4 ton | £ 74 / ton Order 20 ton: £ 31 / ton | Order |
| MOT Type 1 Sub Base |
|
1 truckload | £ 734 Order 20 truckload: £ 707 / truckload | Order |
| MOT Type 1 Sub Base |
|
1 Bag | £ 108 | Order |
| MOT Type 1 Sub Base |
|
1 Bag | £ 146 | Order |
| Type 1 ECO Blend |
|
10 ton | £ 53 / ton Order 20 ton: £ 22 / ton | Order |
| Type 1 Limestone Sub Base |
|
10 ton | £ 62 / ton Order 20 ton: £ 31 / ton | Order |
| Type 1 Limestone Sub Base |
|
1 truckload | £ 374 Order 20 truckload: £ 366 / truckload | Order |
| Type 1 Limestone Sub Base |
|
1 Bag | £ 118 | Order |
| Type 1 Limestone Sub Base |
|
1 Pallets | £ 147 | Order |
| Type 3 Sub Base |
|
2 Pallets | £ 272 / Pallets Order 16 Pallets: £ 271 / Pallets | Order |
| Type 3 Sub Base |
|
1 truckload | £ 1,140 | Order |
Or see prices for all of Bristol, South West England or every UK region.
Every price on this page includes VAT and delivery to BS13 Bristol, City of. There is nothing added at checkout, and you do not need an account to see prices or to order. Prices differ from one postcode to the next because haulage from the nearest quarry, gravel pit or depot is part of the cost – the closer the material is to you, the less you pay for moving it.
Four delivery methods are available, and which ones you can choose depends on the product and on what the depots serving your area can reach:
Check the width of the access route and decide where the material should be put down. Deliveries usually arrive one to three working days after payment clears. You do not have to be there, but if you are not, the driver chooses where to unload – so leave written instructions if the spot matters. Gravel, sand and soil cannot be delivered onto a soft or sloping surface unless a crane or grab truck is used.
The gravel calculator converts length, width and depth into cubic metres and tonnes for each material, so you can order the right quantity the first time. For anything larger than a single load, ask for a quote and we will price the job directly.